LATEST NEWS :
FREE Orientation @ Kapoorthala Branch on 30th April 2024 , FREE Workshop @ Kanpur Branch on 29th April , New Batch of Modern History W.e.f. 01.05.2024 , Indian Economy @ Kanpur Branch w.e.f. 25.04.2024. Interested Candidates may join these workshops and batches .
Print Friendly and PDF

India’s first Hypervelocity Expansion Tunnel Test Facility

08.02.2024

India’s first Hypervelocity Expansion Tunnel Test Facility , Daily Current Affairs , RACE IAS : Best IAS Coaching in Lucknow 

 

For Prelims:About India’s first Hypervelocity Expansion Tunnel Test Facility,

         

Why in the news?

The Indian Institute of Technology Kanpur (IIT-K) has successfully established and tested India’s first Hypervelocity Expansion Tunnel Test Facility recently.

 

About India’s first Hypervelocity Expansion Tunnel Test Facility:

  • The S2, nicknamed 'Jigarthanda', is a 24-metre-long facility located at IIT Kanpur’s Hypersonic Experimental Aerodynamics Laboratory (HEAL) within the Department of Aerospace Engineering.
  • It is India’s first Hypervelocity Expansion Tunnel Test Facility.
  • It was indigenously designed and developed over three years with funding and support from the Aeronautical Research and Development Board (ARDB), the Department of Science and Technology (DST), and IIT Kanpur.
  • It is capable of generating flight speeds between 3-10 km/s, simulating the hypersonic conditions encountered during the atmospheric entry of vehicles, asteroid entry, scramjet flights, and ballistic missiles.
  • It will be a critical asset for the Indian Space Research Organisation (ISRO) and the Defence Research and Development Organisation (DRDO).
  • It will serve as a testing ground for ongoing missions of ISRO and DRDO like Gaganyaan, Reusable Launch Vehicles (RLV), and hypersonic cruise missiles, enabling the development of more advanced and reliable aerospace technologies.

 

                                                                Source:India Today